Case Study

Project Malvern

Project: Soil Nailing & Mesh
Location: Malvern
Contract Duration: 6 Days
Soil Nails Installed: 64
Area Treated: 150m2

 

Redevelopment of a building plot in the Malvern Hills.

The aim of this project was to clear an existing stone wall and associated debris to enable us to re-profile a steep slope and prepare the ground for soil nailing ready to accommodate a new larger dwelling.

5m soil nails were installed in the upper section of the newly formed 70° slope, then reducing the length to 3m on the lower section. Netlon STR7005 6mm mesh was placed over the slope and then a 4mm triple coated galvanised re-enforcement mesh. The preferred plant used on this project was a 6t excavator and our state of the art rotary percussive Marini Drilling Mast attachment.

Ask for a similar project

 

  • (1) start.jpg
  • (2) dig out face.jpg
  • (3) day 2.jpg
  • (4) day 3.jpg
  • (5) day 4.jpg
  • (6) day 5.jpg
  • (7) day 6 finish.jpg
  • (8) day 6 finish.jpg

Choose us for reliability

No matter if its a big complicated project or a small basic project, we aim to ensure your project is completed both ontime and on budget.


Known for innovation

With our vast experience in this area we can find a solution for your project no matter how difficult or challanging your project may be.

Select us for quality

With over 50 years combined experience in this industry, be rest assured your project will be completed professionally and the the highest standards.


Contact us for more info...

For more information or to discuss your project, please dont hesitate to contact us and we will be happy to discuss your requirements.

View Services or Get Free Quote