Project Lister

Project: Stabilisation of slope adjacent to a highway junction
Location: Lister, Stevenage
Contract Duration: 5 Days
Anchors Installed: 34 soil nails 4m long.
Area Treated: 98m2

 

Regrading of verge adjacent to highway junction with soil nails ,double twist mesh and geocell soil retaining system.

The junction adjacent to the Lister Hospital was re-designed and due to the angle at which the adjacent verge was left additional support and regrading was required. The project required traffic management and lane closures, which reduced the available working hours and required daily reinstatement of the footpath. The highest part of the slope was soil nailed with double twist mesh and geocell fixed to the slope to retain topsoil and enable the slope to be vegetated. The adjacent slope was re-profiled to a more stable angle and the spoil spread and compacted to the adjacent area.

The overall length of the slope wall about 70m with a maximum slope height of 5m. A total of 34No. 4m long soil nails were installed.

Ask for a similar project

 

  • 0.jpg
  • 1.jpg
  • 2.JPG
  • 3.jpg
  • 4.jpg
  • 5.jpg
  • 6.jpg
  • 7.jpg
  • 8.JPG
  • 9.jpg

Choose us for reliability

No matter if its a big complicated project or a small basic project, we aim to ensure your project is completed both ontime and on budget.


Known for innovation

With our vast experience in this area we can find a solution for your project no matter how difficult or challanging your project may be.

Select us for quality

With over 50 years combined experience in this industry, be rest assured your project will be completed professionally and the the highest standards.


Contact us for more info...

For more information or to discuss your project, please dont hesitate to contact us and we will be happy to discuss your requirements.

View Services or Get Free Quote