Project Leeds

Project: Design and Build Project - Slope Stabilisation
Location: Leeds
Contract Duration: 9 Days
Anchors Installed: 66 No. 6m long Soil Nails
Area Treated: 90m2

 

Slope protection and Stabilisation for a new housing development.

JTS undertook this project on a Design and Build basis. The aim of this project was to stabilise and protect the slope to the rear of the gardens for a new housing project. At the top of the new slope were existing properties.
The slope was excavated to an angle of 68 degrees and 66 soil nails each 6m deep were installed in 5 rows. Erosion matting was then placed on the slope to prevent degradation of the surface and facilitate vegetative growth. This matting was then held in place with rockfall mesh secured to the soil nails. Pre-seeded coir matting and a 100mm thickness of topsoil were also installed to provide a vegetated finish.

The preferred plant used on this project was a 6t excavator and our state of the art rotary percussive Marini Drilling Mast attachment.

Ask for a similar project

 

  • 2.jpg
  • 3.jpg
  • 4.jpg
  • 5.jpg
  • 6.jpg

Choose us for reliability

No matter if its a big complicated project or a small basic project, we aim to ensure your project is completed both ontime and on budget.


Known for innovation

With our vast experience in this area we can find a solution for your project no matter how difficult or challanging your project may be.

Select us for quality

With over 50 years combined experience in this industry, be rest assured your project will be completed professionally and the the highest standards.


Contact us for more info...

For more information or to discuss your project, please dont hesitate to contact us and we will be happy to discuss your requirements.

View Services or Get Free Quote