Project Girvan - Phase 2

Project: Soil Nailing
Location: Girvan
Contract Duration: 3 Days
Soil Nails Installed: 60
Area Treated: 90m2

 

Existing site features prevented the construction of the normally employed safe temporary earthworks batters to enable excavations for the construction of reinforced concrete works at two locations on the site.

The depth of excavation at one of the locations was approaching 5.0m deep. Soil nail stabilised steep slopes were chosen as the most cost effective and efficient solution enabling the excavations to be maintained within the site constraints.

Intec Project Solutions Ltd and JTS Geotechnical Solutions Ltd provided the design and installation of the soil nailing including the use of protective membranes and meshing to maintain the integrity of the face of the 70 degree slope whilst the adjacent works were undertaken.

Working closely with the Main Contractor who undertook excavations and trimming of the face, soil nails and facing were installed working down from the top enabling completion within a very tight programme.

Ask for a similar project

 

Choose us for reliability

No matter if its a big complicated project or a small basic project, we aim to ensure your project is completed both ontime and on budget.


Known for innovation

With our vast experience in this area we can find a solution for your project no matter how difficult or challanging your project may be.

Select us for quality

With over 50 years combined experience in this industry, be rest assured your project will be completed professionally and the the highest standards.


Contact us for more info...

For more information or to discuss your project, please dont hesitate to contact us and we will be happy to discuss your requirements.

View Services or Get Free Quote