Case Study

Project Aberlink

Project: Mini Piling
Location: Stroud
Contract Duration: 4 Days
Piles Installed: 13
Equipment: T15000 Mini Rig

 

At a light industrial premises in Gloucestershire. Phase 2 of the work - JTS Geotechnical prepared the ground for the new engineering building by cutting out the existing concrete slab. Due to the limited access at the rear of the building and the vibration sensitive equipment in the adjoining building bored piles was the chosen method. A T15000 mini rig was the preferred equipment used to undertake the work. 13 no 300dia bored piles to a depth of 7.5mts were installed.

Ask for a similar project

 

  • ABERLINK 1.jpg
  • ABERLINK 2.jpg
  • ABERLINK 3.JPG
  • ABERLINK 4.jpg
  • ABERLINK 5.jpg

Choose us for reliability

No matter if its a big complicated project or a small basic project, we aim to ensure your project is completed both ontime and on budget.


Known for innovation

With our vast experience in this area we can find a solution for your project no matter how difficult or challanging your project may be.

Select us for quality

With over 50 years combined experience in this industry, be rest assured your project will be completed professionally and the the highest standards.


Contact us for more info...

For more information or to discuss your project, please dont hesitate to contact us and we will be happy to discuss your requirements.

View Services or Get Free Quote